POWERCHINA Huadong Engineering Uses BIM

POWERCHINA Huadong Engineering Corporation Limited (HDEC) is responsible for the digital engineering of Shaoxing’s new Urban Rail Transit Line 1
Construction of the 34.1-kilometer line in the Zhejiang province is planned to finish in June 2021, with railway operations scheduled to commence in 2022
Real-time analysis and processing of data from multiple sources in a connected data environment is helping HDEC improve decision-making across its entire business
Digital workflows are enabling HDEC to increase productivity, improve quality, mitigate risk, and lay the foundations of a digital twin of the railway for use in operations and maintenance.

Check out this awesome BIM case study here

Leave a Reply

Your email address will not be published. Required fields are marked *